Professional Experience

1. All phases of soil and rock mechanics investigation including geotechnical , geological and hydrogeological field and laboratory testing and report preparation dealing with stability of foundations and recommendations on economical foundation design in several sites of the following Egyptian regions :

 

  Cairo; Alexandria; Giza; Kalubia; Dahaklia; Monofia; Sharkia; Sinai; Red Sea; Beni swif; Sohaq; Aloksor; Aswan; Kafr- Elshikh;  Ismalia; Suez; Port-Said; Domiatte; Marsi Matrouh   6th October city; El-ouber city; Badr city; 10th Ramadan city; El- Shorouq city; El-Ameria city; El-Sadate city and Nasr city.

 

2. Visting Professor at School of Civil, Urban& Geosystem Engineering , Seoul National University, South Korea, Juin 1 – 12,  2003 and Contribution to a research project entitled "Determination of durability of monument stone using the digital image technique."

 

3. Visting Professor at Public Work Research Institute (PWRI), Ministry of Construction, Tuskuba City, Japan, from May 15, 1998 to August 15, 1998  and Contribution to a research project entitled "Envionmental Impact on The Durability of Some Egyptian and Japanese Limestones."

 

4.  Visting Professor at University of Cincinnati, Ohio, U.S.A., from January 1, 1992 to Juin 1 1992 and contribution  in a research project entitled "Effect of Swelling Percentage on the Shearing Strength of a Compacted Liner Material".

 

5. Visting Professor at INPL, Nancy, France, from September 1 to December 1, 1990 and Contribution to a research project entitled "Measurement of Collapsing Potential and Permeability of an Egyptian Cemented Sand Using Triaxial Apparatus."

 

6. Geotechnical engineer for Consortium of Several European  Companies from January 1,         1981 to October 31, 1984 in the  Following Projects in France:

 

     - Earth Dam of Haute Saison, Lyon, France.

     - Rock Tunnel between Nantia in France and Swiss.

     - Nuclear Power Station of Cattenom, Thion-Ville, France.

 

7. Geotechnical engineer for a petroleum pipeline project between  Suez and Helwan in Egypt       Including Construction of 200 mm Dim. R.C. Pipe lines of 100 km length from October 1, 1974 to July 31 1975.

 

 